Chevron Gorgon LNG Gas Project

Chevron Gorgon LNG Gas Project – Accommodation Village Modular HWU Manifolds for TDK (2010 – 2012)

RRPS were employed to develop and design a prefabricated plumbing system for the Hot water plant room on Barrow Island. These Plant room consisted of a plumbing pipework that could be premade off site and sent via barge to the island, and then reassembled on site.

This time saving design save tens of thousands of dollars on installation cost for each accommodation modules.

  • Client Chevron
  • Date 31 July, 2017
  • Tags Maintenance, Water Treatment

Related Projects